State Spur 527 Project

UPDATE – May 22

SMBC received the following from TxDOT on Friday, May 19:

Please see below for updates, (in red font), for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

The contacts for these closures are Jose Vasquez with Atkins at 713.582.6865, Paul Eley with TxDOT at 281.536.3129, and Danny Perez with TxDOT PIO at713.802.5077.

 Near Term Closures:

  1. Spur 527 Northbound Frontage Rd. between Richmond Ave. and Colquitt.: Total closure continuously through 5:00 AM on Tuesday, 05.23.17.

Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.

  1. Bute St. between Richmond Ave. and the Spur 527 Northbound Frontage Rd.:Total closure continuously through 5:00 AM on Tuesday, 05.23.17.

Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.

  1. Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.: Two Left, (Inside) lanes closed continuously through 5:00 AM on Tuesday, 05.23.17.
  2. Spur 527 Northbound Exit to Travis St.: Left (Inside) lane closed continuously thru 5:00 AM on Tuesday, 05.23.17.
  3. Spur 527 Southbound Frontage Rd. between Alabama Street and Richmond Ave.:Alternate lanes closed continuously through 5:00 AM on Monday, 06.26.17. At least one lane will remain open at all times.

Daily Closures:

  1. None at this time.

 Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously through 5:00 AM on Tuesday, 05.23.17. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

Upcoming Closures: 

  1. None at this time.

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs remain in place.


UPDATE – April 3

SMBC received the following from TxDOT on Sunday, April 2:

Please see below for updates, for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

The contacts for these closures are Jose Vasquez with Atkins at 713.582.6865, Paul Eley with TxDOT at 281.536.3129, and Danny Perez with TxDOT PIO at713.802.5077.

 Near Term Closures:

  1. Richmond Ave. Eastbound between Jack St. & Main St.:  Alternate Lanes closed daily between 9:00 AM and 3:00 PM through Friday, 04.07.17.  At least one lane will remain open at all times.
  2. Richmond Ave. Westbound between Main St. and Jack St.:  Alternate Lanes closed daily between 9:00 AM and 3:00 PM through Friday, 04.07.17.  At least one lane will remain open at all times.
  3. Spur 527 Northbound Frontage Rd. between Richmond Ave. and Colquitt.: Total closure continuously through 5:00 AM on Monday, 05.22.17.

Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

  1. Bute St. between Richmond Ave. and the Spur 527 Northbound Frontage Rd.: Total closure continuously through 5:00 AM on Monday, 05.22.17.

Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

  1. Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.: Two Right, (Outside) lanes closed continuously through 5:00 AM on Monday, 05.22.17.   (There are two driveways for SMBC within these limits.  At least one driveway will remain open at all times.)

 

Daily Closures:

  1. None at this time.

 

Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously through 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

 

Upcoming Closures: 

  1. None at this time.

 

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

 

Off Duty Police Officers will be on site to assist, as needed.

 

Multiple changeable message signs remain in place.


UPDATE – March 21

SMBC received the following from TxDOT on Saturday, March 18:

Please see below for updates, (in red font), for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

Near Term Closures:

  1. Richmond Ave. Eastbound between Jack St. & Main St.:  One Right, (Outside) Lane closed daily between 9:00 AM and 3:00 PM through Monday, 03.27.17.  At least one lane will remain open at all times.
  2. Richmond Ave. Westbound between Main St. and Jack St.:  One Right, (Outside) Lane closed daily between 9:00 AM and 3:00 PM through Monday, 03.27.17.  At least two lanes will remain open at all times.
  3. Spur 527 Northbound Frontage Rd. between Richmond Ave. and Colquitt.: Total closure continuously through 5:00 AM on Monday, 04.03.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
  4. Bute St. between Richmond Ave. and the Spur 527 Northbound Frontage Rd.: Total closure continuously through 5:00 AM on Monday, 04.03.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
  5. Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.: Two Right, (Outside) lanes closed continuously through 5:00 AM on Monday, 04.17.17.   (There are two driveways for SMBC within these limits.  At least one driveway will remain open at all times.)
  6. Spur 527 Southbound Frontage Rd. between Garrott St. and Richmond Ave.: Two Right, (Outside) lanes closed continuously through 5:00 AM on Monday, 03.27.17

Daily Closures:

  1. None at this time.

 Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously through 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

Upcoming Closures: 

  1. None at this time.

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs have been placed for advance notice.


UPDATE – March 18

SMBC received the following from TxDOT on Saturday, March 18:

All,

Please see below for updates for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

Near Term Closures:

  1. Richmond Ave. Eastbound between Jack St. & Main St.:  Alternate Lanes remain closed continuouslythrough 5:00 AM on Monday, 03.27.17.  At least two lanes will remain open at all times.
  2. Richmond Ave. Westbound between Main St. and Jack St.:  Alternate Lanes closed continuously through 5:00 AM on Monday, 03.27.17.  At least one lane will remain open at all times.
  3. Spur 527 Southbound (Outbound) Entrance Ramp from Richmond Ave. access from Richmond Ave. Westbound and from the Spur 527 Southbound Frontage Rd.: Access to this ramp from all directions including Richmond Ave. Westbound and the Spur 527 Southbound Frontage Rd. was restored at 12:00 PM (Noon) today, 03.18.17.
  4. Spur 527 Northbound Frontage Rd. between Richmond Ave. and Colquitt.: Total closure continuously through 5:00 AM on Monday, 03.27.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
  5. Bute St. between Richmond Ave. and the Spur 527 Northbound Frontage Rd.: Total closure continuously through 5:00 AM on Monday, 03.27.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
  6. Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.: Two Right, (Outside) lanes closed continuously through 5:00 AM on Monday, 04.17.17.   (There are two driveways for SMBC within these limits.  At least one driveway will remain open at all times.)
  1. Spur 527 Southbound Frontage Rd. between Garrott St. and Richmond Ave.:Two Right, (Outside) lanes closed continuously through 5:00 AM on Monday, 03.27.17

Daily Closures:

  1. None at this time.

 Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously through 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

Upcoming Closures: 

  1. None at this time.

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs have been placed for advance notice.


UPDATE – March 14

SMBC received the following from TxDOT on Tuesday, March 14:

Please see below for updates for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

Near Term Closures:

  1. Richmond Ave. Eastbound between Jack St. & Main St.:  Multiple Alternate Lanes remain closed continuously through 5:00 AM on Monday, 03.27.17.  At least two lanes will remain open at all times.
  2. Richmond Ave. Westbound between Main St. and Jack St.:  Multiple Alternate Lanes closed continuouslybetween through 5:00 AM on Monday, 03.27.17.  At least one lane will remain open at all times.
  3. Spur 527 Southbound (Outbound) Entrance Ramp from Richmond Ave. access from Richmond Ave. Westbound and from the Spur 527 Southbound Frontage Rd.: Total Closure continuously through 5:00 AM on Monday, 03.27.17.   Detour:  From Downtown:  Access Spur 527 Southbound (Outbound)/US 59 Southbound (Outbound) via the W. Alabama Entrance Ramp or follow the Spur 527 Southbound Frontage Rd. to Richmond Ave.; Turn Right, (West), on Richmond Ave.; Follow Richmond Ave. to Shepherd Dr./Farnham St.;  Follow Shepherd Dr./Farnham St. to the US 59 Southwest Freeway Southbound Frontage Rd.;  Turn Right onto the US 59 Southwest Freeway Southbound Frontage Rd and follow it to the next Southbound Mainlanes entrance ramp.
  4. Spur 527 Northbound Frontage Rd. between Richmond Ave. and Colquitt.: Total closure continuously through 5:00 AM on Monday, 03.27.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.
  5. Bute St. between Richmond Ave. and the Spur 527 Northbound Frontage Rd.: Total closure continuously through 5:00 AM on Monday, 03.27.17.
    Detour from Eastbound Richmond Ave.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
    Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..
  1. Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.:Two Right, (Outside) lanes closed continuously between 9:00 AM on Tuesday, 03.14.17 and 5:00 AM on Monday, 04.17.17.   (There are two driveways for SMBC within these limits.  At least one driveway will remain open at all times.)

 

Daily Closures:

  1. None at this time.

Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously through 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

Upcoming Closures: 

  1. None at this time.

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs have been placed for advance notice.


UPDATE – March 10

SMBC received the following information from TxDOT on Friday, March 10:

Please see below for updates for SIGNIFICANT lane closures that will facilitate the continuation of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work is continuing within the limits of the Richmond/Spur 527 Intersection and beginning  on the Spur 527 Northbound (Inbound) Frontage Rd. as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and we are all working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

Near Term Closures:

  1. Richmond Ave. Eastbound between Jack St. & Main St.:  Multiple Alternate Lanes remain closed continuously through 5:00 AM on Monday, 03.27.17.  At least one lane will remain open at all times through 10:00 AM on Friday, 03.10.16:   At least two lanes will remain open at all times between 10:00 AM on Friday, 03.10.16 and 5:00 AM on Monday, 03.27.17.
  2. Richmond Ave. Westbound between Main St. and Jack St.:  Multiple Alternate Lanes closed continuouslybetween through 5:00 AM on Monday, 03.27.17.  At least two lanes will remain open at all times through 10:00 AM on Friday, 03.10.16.   At least one lane will remain open at all times between 10:00 AM on Friday, 03.10.16 and 5:00 AM on Monday, 03.27.17.
  3. Spur 527 Southbound (Outbound) Entrance Ramp from Richmond Ave.  Total Closure continuouslybetween 9:00 AM on Wednesday, 03.01.17 and 3:00 PM on Friday, 03.10.17.  Detour:  From Downtown:  Access Spur 527 Southbound (Outbound)/US 59 Southbound (Outbound) via the W. Alabama Entrance Ramp or follow the Spur 527 Southbound Frontage Rd. to Richmond Ave.; Turn Right, (West), on Richmond Ave.; Follow Richmond Ave. to Shepherd Dr./Farnham St.;  Follow Shepherd Dr./Farnham St. to the US 59 Southwest Freeway Southbound Frontage Rd.;  Turn Right onto the US 59 Southwest Freeway Southbound Frontage Rd and follow it to the next Southbound Mainlanes entrance ramp.
  4. Spur 527 Northbound Frontage Rd. at the Richmond Ave Intersection.: Total closure continuously between Richmond Ave. and Colquitt between 9:00 AM on Friday, 3.10.17 and 5:00 AM on Monday, 03.27.17.

Detour from Richmond Ave. Eastbound: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left, (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

5. Bute St. at Richmond Ave.: Total closure continuously between Richmond Ave. and the Spur 528 Northbound Frontage Rd. between 9:00 AM on Friday, 3.10.17 and 5:00 AM on Monday, 03.27.17.

Detour from Richmond Ave. Eastbound.: Continue East on Richmond; Turn Left, (North) on San Jacinto; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St..

Detour from Westbound Richmond Ave.: Turn Right, (North) on San Jacinto St.; Turn Left (West) on W. Alabama St.; Follow W. Alabama to Travis St.; Turn Right, (North) on Travis St.

       6.  Spur 527 Northbound Frontage Rd. between Colquitt and Branard St.: Two Right, (Outside) lanes closed continuously between 9:00 AM on Tuesday, 03.14.17 and 5:00 AM on Monday, 04.17.17.   (There are two driveways for SMBC within these limits.  At least one driveway will remain open at all times.)

 

Daily Closures:

  1. None at this time.

 

Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously between 9:00 AM on Wednesday, 03.01.17 and 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

 

Upcoming Closures: 

  1. None at this time.

 

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs have been placed for advance notice.


UPDATE – March 1

SMBC received the following information from TxDOT today:

Please see below for details of SIGNIFICANT closures that will facilitate the start of the reconstruction Spur 527 Frontage Roads between Richmond Ave. and Alabama.  Work will begin within the limits of the Richmond/Spur 527 Intersection as detailed below.

Motorists should expect delays and are strongly encouraged to seek alternate routes.

TxDOT is partnering with our contractor on a continuous basis and will be working towards a goal of completing the reconstruction of the Spur 527 Frontage Roads at the very earliest date possible.

These closures have been input into the TxDOT PIO system.

Near Term Closures:

  1. Richmond Ave Eastbound between Jack St. & Main St.:  Multiple Alternate Lanes closed continuously between 9:00 AM on Monday, 02.27.17 and 5:00 AM on Monday, 03.13.17.  At least one lane will remain open at all times.
  2. Richmond Ave Westbound between Main St. and Jack St.:  One Left, (Inside) Lane closed continuously between 9:00 AM on Monday, 02.27.17 and 5:00 AM on Monday, 03.13.17.  At least two lanes will remain open at all times.
  3. Spur 527 Southbound (Outbound) Entrance Ramp from Richmond Ave.  Total Closure continuously between 9:00 AM on Wednesday, 03.01.17 and 5:00 AM on Monday, 03.13.17.  Detour:  From Downtown:  Access Spur 527 Southbound (Outbound)/US 59 Southbound (Outbound) via the W. Alabama Entrance Ramp or follow the Spur 527 Southbound Frontage Rd. to Richmond Ave.; Turn Right, (West), on Richmond Ave.; Follow Richmond Ave. to Shepherd Dr./Farnham St.;  Follow Shepherd Dr./Farnham St. to the US 59 Southwest Freeway Southbound Frontage Rd.;  Turn Right onto the US 59 Southwest Freeway Southbound Frontage Rd and follow it to the next Southbound Mainlanes entrance ramp.

Daily Closures:

  1. Spur 527 Southbound Frontage Rd at the Richmond Ave. Intersection: Alternate Lanes Closed Daily between 9:00 AM to 3:00 PM on Monday, 02.27.17 and Tuesday, 02.28.17. At least one lane will remain open at all times.
  2. Spur 527 Northbound Frontage Rd at the Richmond Ave. Intersection: Alternate Lanes Closed Daily between 9:00 AM to 3:00 PM on Monday, 02.27.17 and Tuesday, 02.28.17. At least one lane will remain open at all times.

Long Term Closures:

  1. Spur 527 Northbound (Inbound) Exit to Richmond Ave.  Total Closure continuously between 9:00 AM on Wednesday, 03.01.17 and 5:00 AM on Monday, July 10, 2017. Detour: Follow the Spur 527 Northbound (Inbound) Mainlanes to the next Exit which is the exit to Travis/Alabama.

Upcoming Closures: 

  1. Richmond Ave Eastbound between Jack St. & Main St.:  One Left, (Inside) Lane closed continuouslybetween 5:00 AM on Monday, 03.13.17 and 5:00 AM on Monday, 03.27.17.  At least two lanes will remain open at all times.
  2. Richmond Ave Westbound between Main St. and Jack St.:  Two Left, (Outside) Lanes closed continuouslybetween 5:00 AM on Monday, 03.13.17 and 5:00 AM on Monday, 03.27.17.  At least one lane will remain open at all times.

 

All closures are subject to cancellation or modification due to adverse weather. For information, call the Public Information Office at (713) 802-5076.

Off Duty Police Officers will be on site to assist, as needed.

Multiple changeable message signs have been placed for advance notice.

 


 

You have probably noticed the beginning stages of construction work at the Richmond/Spur 527 intersection. TxDOT has begun mobilizing crews and preparing to start work within a few weeks. This project’s scope is the reconstruction of the existing frontage roads and intersections, sidewalks, curb ramps and pavement markings for State Spur 527 from Richmond avenue to Alabama Street, South East of downtown Houston.

A few things to note:

Beginning on March 1, the Richmond exit off of Spur 527 will be closed. Drivers will be rerouted to use the Travis Street exit.

The total project is estimated to run 220 days, roughly 8 months.

Click HERE for a map of the area of work.

TxDOT has reached out to the church, and been a good neighbor in the planning for this project. On February 8, Brad Jernberg, Bill Pugh, and Mark Gribble attended a pre-construction meeting at their office. We received a detailed description of the schedule and scope of work, as well as a contact list for all subcontractors and TxDOT officials working on this project.

As we learn further details of this project, we will communicate as early and as often as we are able.

 

 